100kW Solar Carport E-Bike Charging Station System - Complete Equipment Configuration
A turnkey PV carport that shades vehicles by day and charges a fleet of Easy Bike e-rickshaws with metered, paid, remotely managed charging.
At a glance
- System Overview
- 1. PV System
- 2. Charging System
- 3. Distribution & Safety
- Why Each Choice Matters
- Frequently Asked Questions
System Overview
1. PV System
| Component | Specification | Key Requirement / Rationale |
|---|---|---|
| PV Modules | 585W-620W TOPCon bifacial modules; approx. 170-180 modules to reach 100 kWp | BSTI certification required for grid-connected PV equipment in Bangladesh |
| PV Inverter | 80-100 kW, string type or central type | Must comply with Bangladesh grid-connection standards (BDS IEC 62109 and related) |
| Carport Structure | Hot-dip galvanized steel frame with elevated pile foundation | Bangladesh rainy season brings frequent flooding - raised structure is mandatory to keep equipment above water |
2. Charging System
| Component | Specification | Key Requirement / Rationale |
|---|---|---|
| Smart Chargers | 40 charging points, approx. 2.2 kW per point | Must match the battery voltage of mainstream Bangladeshi e-rickshaws (Easy Bike), e.g. 60V / 72V |
| Charging Management System | 4G connectivity, QR-code / card payment, EMS dispatch | Remote monitoring and billing are essential to prevent electricity theft and unpaid usage |
3. Distribution & Safety
| Component | Specification | Key Requirement / Rationale |
|---|---|---|
| Grid-Connection / Distribution Cabinet | Equipped with bidirectional (import-export) metering | Meets net-metering or self-consumption-with-export requirements |
| Fire Protection & CCTV | Fire suppression equipment + surveillance cameras | Mandatory for carport charging scenarios - lithium battery fires need fast response |
| Optional (Strongly Recommended): Battery Energy Storage | 50-100 kWh LFP battery cabinet | Discharges during evening peak to cut demand charges and smooth PV output fluctuations |
Why Each Choice Matters
BSTI-certified modules and BDS IEC 62109 compliant inverter: Bangladesh requires certification for grid-connected equipment; skipping it risks customs delays and grid-operator rejection.
Elevated hot-dip galvanized carport: during the monsoon season many charging yards flood; raising the piles keeps chargers, cabinets and vehicles above water and protects the steel from corrosion.
40 × 2.2 kW points matched to 60V/72V: a single Easy Bike pack charges comfortably within 3-4 hours, so 40 points can rotate more than 120 vehicles per day with staged charging.
4G management, QR/card payment and EMS: per-session authentication and billing stop electricity theft - the single biggest profit leak in unmanaged charging yards - while EMS dispatch shifts charging toward PV-rich hours.
50-100 kWh LFP storage (optional but strongly recommended): the battery cabinet discharges during the evening peak when e-rickshaws return, cutting demand charges and smoothing PV fluctuation; it also keeps a number of sockets alive during grid outages.
Frequently Asked Questions
How much energy does a 100 kWp solar carport charging station produce per day in Bangladesh?
At Bangladesh's average yield of roughly 3.8-4.2 kWh per installed kW per day, a 100 kWp canopy generates about 380-420 kWh daily - enough to fully charge 60-80 Easy Bike packs (approx. 5-6 kWh each) under staged charging.
Can the system work without the battery storage cabinet?
Yes. The station runs grid-tied with net-metering even without storage; the 50-100 kWh LFP cabinet is optional but strongly recommended because it reduces evening-peak demand charges and keeps sockets alive during outages.
Which charging connectors are used for Easy Bike e-rickshaws?
Charging points are configured for the 60V/72V DC battery packs used by mainstream Bangladeshi Easy Bikes, with smart output control, per-session metering and QR-code or RFID card payment.
Does Wanlin provide the whole system or only chargers?
Wanlin supplies the complete smart charging and energy-management layer - chargers, EMS, payment and monitoring platform - and cooperates on the PV, structure and distribution scope, factory-direct with OEM/ODM support.
Get a Site-Specific Quotation
Send us your site area, vehicle fleet size and grid connection details, and our engineers will return a per-socket configuration and ROI estimate within 48 hours.
Email: wanlinfirecontrol@163.com · Tel/WhatsApp: 16710807777
Comparing options and confirming market compliance
Most buyers narrow the choice to two or three configurations before requesting a quotation, and the differences that decide the outcome are rarely the ones printed on a product-family brochure. Compared with a self-contained device, a networked option adds central visibility and event logging, but it also adds gateway or cabling cost and commissioning work; a monitored service moves part of the capital cost into an ongoing fee. Vendors typically describe these trade-offs in general terms, so the practical test is to apply the same five criteria to every candidate: protected area, local alarm behaviour, reporting path, power arrangement, and the evidence available for the destination market.
| Destination market | Regime that normally applies | Evidence to request |
|---|---|---|
| European Union | CE marking, with fire detection products assessed against the EN 54 series under the Construction Products Regulation | Declaration of performance and the EU-type examination certificate for the exact model |
| United States | Listing by a recognised testing laboratory, commonly UL or ETL, with installation governed by NFPA 72 | Listing file number and the standard the product was evaluated against |
| China | CCCF certification for fire products | Certificate number and the scope covering model and configuration |
| United Kingdom | CE marking continues to be accepted, alongside the UKCA scheme | Current certificate and the designated standard applied |
| Other markets | National or regional scheme set by the local authority | Written confirmation of the applicable scheme and accepted marks |
This section describes regulatory requirements, not the certification status of any specific product. Confirm status against the certificate issued for the exact model and configuration.
Frequently asked questions
Which certification applies to this equipment?
The regime follows the market of installation, not the market of manufacture. The same hardware may need CE marking with an EN 54 assessment for the European Union, a laboratory listing such as UL for the United States, and CCCF certification for China. Where a project crosses borders the specification should name the regime explicitly, and the supplier should confirm that the certificate scope covers the exact model, radio option and configuration being quoted.
How do the available options usually differ?
Most requirements can be met by one of three shapes of solution: a self-contained device that raises a local alarm, a networked system that reports to a panel or gateway, and a monitored service that adds remote supervision. Compared with a self-contained device, a networked system adds central visibility and an event log; compared with an unmonitored installation, a monitored service adds response but introduces a recurring fee. Vendors typically present one shape as the default, so the decision should follow the consequence of a missed alarm, the number of points to cover, and who is on site to respond.